Well that's really built into ITMU and is a matter of the selections you make when running the DSUW. The hardest question to answer is 48 hours from when? If you say the patch must be installed by date X and allow a 48 hour grace (/g:48) then a user will be given a 48 hour window to postpone. After that, the option is grayed out. But if you pick 48 hours after detection (/d) then only once a machine scans and detects the need for a patch is the time the 48 hour window starts. Few people pick that option.